The first wall tiles went up in that corner! |
With the light fixtures |
The rest of the wall tiles went in |
Shower wall tiles went up before the floor went in |
This was a tricky wall to figure out |
We have a foot prop shelf |
The toilet got moved back behind the shower |
The finished product |
Finished walls |
Still waiting on those glass doors |
Medicine cabinet is up |
We found a great piece of furniture at Pier 1 to for storage |
Other side of the shower |
4 comments:
It looks awesome! Projects like that are so expensive but the important thing is that it was done right!! Having a contractor that is thorough is so important as you don't want to go back and have to fix anything down the road. I hope the shower door gets install soon so it can be 100% done!
Looks amazing! Love the tile work.
Looks great!
Yikes that is a hefty price tag! I remember us getting some outrageous quotes when we wanted to reno our bathroom, we ended up scaling the reno's wayyyyy back and just doing it ourselves!! The tile looks AWESOME though!!
Post a Comment